Optimal Calculation
Kwun
Monthly Cleaning Task(MW) / Cost Per Megawatt($)
Model
Labor & Kwun
1 MW
2 MW
3 MW
4 MW
5 MW
6 MW
B30M2
0 + 1
820
433
303
-
-
-
1 + 1
4270
2383
1753
-
-
-
1 + 2
4798
2523
1764
1385
1158
1006
B30L2
0 + 1
674
360
255
-
-
-
1 + 1
4124
2310
1705
-
-
-
1 + 2
4506
2377
1667
1312
1099
957
B20L2
0 + 1
572
320
-
-
-
-
1 + 1
4247
2495
-
-
-
-
1 + 2
4380
2375
1707
1373
-
-
B10L2
0 + 1
542
-
-
-
-
-
1 + 1
4892
-
-
-
-
-
1 + 2
4556
2649
-
-
-
-

Instructions:

Select "User Type" (for owner or for cleaning company) and "Comprehensive Situation Efficiency" to automatically calculate the cost of multiple combinations.Users according to calculated results select the model and labor&kwun matching collocation.

  • Calculation result: the actual use cost of different models of kwun and different labor&kwun under various monthly cleaning task
  • Monthly cleaning task: refers to the cleaning scale to be completed within one month. If the actual cleaning scale is larger than this scale, it can be increased by corresponding multiples.
  • User type: for owner or for cleaning company. Different user type have different cost calculation methods
  • Comprehensive Situation Efficiency: In actual work, there are two efficiency losses as follows:

    1. Situation Efficiency 1: In the process of work, people stop, lift, turn around, change batteries, etc., resulting in efficiency loss; Situation Efficiency 1 is the ratio of actual efficiency to nominal efficiency;
    2. Situation Efficiency 2: The net working time of 8 hours per day, the actual working time is lost due to travel, work preparation and other reasons; Expressed as the actual working time which minus this efficiency loss divided by eight hours;

    Comprehensive Situation Efficiency is a indicator of the team's actual work efficiency;

    Comprehensive Situation Efficiency=Situation Efficiency 1 * Situation Efficiency 2

    Example:

    Use kwun B30M for cleaning, and the nominal efficiency of this model is 600m²/Hour, the actual cleaning efficiency is 540m²/Hour, Situation Efficiency 1=540/600=90%;

    On the day of operation, it took 3 hours to move between different buildings, Situation Efficiency 2=(8-3)/8=62.5%

    Therefore, Comprehensive Situation Efficiency = 90% * 62.5% = 56.25%